The installation that 1 purpose passes pair of moulds, debug reach exercise extraction discharge to have a standard, ensure equipment, person is safe thereby, stable production gives eligible product. This standard applies to 2 suitable scope the installation of the mould, debug reach operation extraction discharge. Note of method of operation of program of work of serial number of 3 work requirement 1 drop slide block to next dead center A.

journey choosing switch switch comes " inch move " the position. B.

With " both hands pushbutton " drop slide block to next dead center. The angle that notices to observe crankshaft when the operation is indicated plan, with ensuring slide block is leaving dead center too 2 degrees of positions stop 1 ~ . The A of 2 the height that fit a pattern that examine punching machine.

Examine the height combining a model of the mould. B.

The height combining a model that moves the height fitting a pattern of punching machine to tower above mould (if add mat iron, add overlay iron height) 5 ~ 10mm. The height fitting a pattern that is like punching machine adds the sum of the ply that fill up iron under the height combining a model of the mould or mould height, criterion when the installation of the mould is debugged damage the mould easily. The examination of 3 moulds installed surface, nap and clear A should clear seriously the impurity on underside of punching machine slide block, workbench and modular handle aperture and scrap. B.

Nap workbench and mat iron are rough the surface. C.

Clear mould surface. D.

Affirm air cushion device. A.

Notice whether workbench surface is scraggly, be like rough undertake nap with oilstone. B.

Affirm modular handle secures bolt in good condition. C, affirm whether air cushion ejector pin is out of shape when use air cushion, set the position appropriate, length is appropriate, whether to place flotsam. 4 moulds place the A on the workbench in punching machine.

Provide with appropriate bearer carry a mould. B, slide block promotes consummate dead center, set a pattern. C.

The installation direction that confirms a pattern, structure, condition. The mould is carried after when carrying a mould, lowering the broach of forklift. The installation A of 5 moulds.

Mould installation is in work station center, adjust the position, direction. B.

Affirm the position that fill up iron. C, press of electric machinery " stop " pushbutton, when journey speed 20SPM is controlled, those who use flywheel is inertial, drop slowly slide block, in the modular handle aperture that loads modular handle slide block. A.

The central line that arranges the central line that sends a mould feed direction and data should keep consistent. B.

Those who confirm a pattern fall makings opening position, be stemmed by mat iron in case. Avoid to fill up span is too big between iron, cause a mould to be out of shape. C.

The attention is used " inch move " journey operation! 6 coarse adjustment close high A.

Bolt of handle of completely loose model. B.

Drop slide block, make rely on surface of before last model. A.

Push with hand push, check a mould to whether move. B must undertake operating in next dead center. C.

Quarter imprint, ballproof protruding stage, bend, pull late pattern to must be put undertake debugging. A of 7 fixed upper mould.

Affirm the mould secures plant above all. B, diagonally fixed die provides 2 place to be in probably. C.

Screw modular handle secures bolt. A.

Should notice to affirm the mould secures bolt, screw cap and pressing plate to have nondestructive bad appearance. B.

To exceeding the upper mould of 100kg, must secure 4 place. C.

After small force screws modular handle secures bolt, raise upper mould in a way first again gravitational in order to screw. 8 affirm A of mould interior condition.

Sweep mould interior. B, examination mould is departmental. C.

Etc of guide pillar, guide-post bushing is slip ministry oiling. Examination mould has nondestructive partly each bad, wear away, the unusual appearance such as installation mistake. 9 solid place modular A.

Lower mould is secured in next dead center. B.

After fixed good lower mould, promote consummate dead center slide block. A.

Twist fluctuation model to secure bolt with hand force first, run slide block 2-3 route, if do not have the unusual appearance such as vibratile, unusual noise, criterion by arrive gently heavy, screw interactively its; Secure bolt. B.

The fixed bolt of the mould is installed as far as possible standing by mould side. C.

The mould secures position below cannot impending. D.

The attention directs place has Chang Sheng of as good as to ring. Punching machine of 10 essence attune closes height (DH is worth) A, the DH that sets according to exercise standard book is worth or workpiece condition is adjusted appropriately close height. B, put a scrip, examine the degree combining a model of the mould. A.

Add up to modular deepness to what reduce a standard with 0.

2-0.

3 advisable. B.

The change that debugs the model that fold a turn, impress that when pulling late pattern, notices to observe workpiece surface, drawing stamp and angle, deepness, appearance. C.

The attention affirms have very close to each other unoccupied place not all, gnaw the unusual appearance such as the model. The 11 spacing bolt slide block that adjust tappet promote consummate dead center, adjust spacing bolt to make tappet is contacted reliably. A.

The attention secures bolt of good apply the brake. B.

Check ejector pin, top makings of makings board, top is sold, whether is ejector out of shape card lives. 12 adjust A of other treatment condition, affirm punch uses oil and its device. B.

Affirm send makings clearance, pressure, release time, send makings center and height appropriate. C.

Affirm whether air cushion pressure is appropriate. D.

Affirm to be denied on punch journey speed appropriate. The mould adjusts labour to tell handlers concerned exercise essentials, note. 13 A trying a model.

The exercise that move a model should notice to affirm circumjacent condition undertakes cautiously. B.

Very relevant contact is made work after moving a model. C.

Try self check eligibly the model to taste refer examine. A.

The person that classics monitor or relevant responsibility want after be being debugged affirms; Relevant responsibility person offer necessary guidance. B.

The labour that move a model operates concerned punch the note to tell exercise staff. 14 preparation quantity produces A.

Tool and appliance are arranged after end trying a model. B.

Clear try a model to taste. A.

When normal operation, punching machine and send prohibit coming loose on makings machine put a tool. B.

Get on work station try a model to taste clear clean. 15 discharge take mould A.

Clear mould interior flotsam sundry. B.

Check mould technology status. C.

Mould movement position is oiled, to place of point of long-term unused mould besmear prevents rubiginous oil. A.

Try to clear seriously before taking discharge to large mould especially. B.

To be produced next time, the examination has the place that does not have maintenance. If have unusual appearance,report instantly monitor. C.

Change end of the reservation inside mould of curved, drawing goods. 16 slide block drop to must be used to next dead center " both hands pushbutton " fall slide block next dead center. 17 loose moulds secure bolt to loosen on, the fixed bolt of lower mould and modular handle. The attention loosens its secure bolt completely, prevent the mould since belt of punching machine slide block, produce an accident. 18 promotion slide block is used " inch move " operation, promote consummate dead center slide block slowly. When preventing modular handle to secure bolt to did not loosen completely, promote slide block suddenly, take an upper mould. (End) CNC Milling CNC Machining